Seattle Streetcar  
menu
  HOME  |  ABOUT  |  RIDE THE STREETCAR  |  SPONSOR  |  CONTACT
Center City Quick Information

Project Overview

Project Schedule

Project Library

CENTER CITY CONNECTOR

Project Library

Current project folio in English, Spanish, Vietnamese, and Chinese.

Folio inserts

Email updates about the project

Seattle Center City Connector Finding of No Significant Impacts (FONSI) and SEPA Addendum

  • Legal Notices
    • NEPA – Notice of Availability (NOA)
    • SEPA – Notice Addendum to Existing DNS

Environmental Assessment (EA)

List of Appendices:

  • A1,2,3 & 4 - Acronyms, References, List of Recipients, list of Preparers (pdf 0.2 Mb)
  • B1- Seattle Center City Connector Transit Study Volume I: Locally Preferred Alternative Report (pdf 7.5 Mb)
  • B2 - Seattle Center City Connector Transit Study Volume II: Detailed Evaluation Report (pdf 14.8 Mb)
  • C - Construction Phasing Concepts (pdf 12.8 Mb)
  • D4.2 - A, B and C Intersection Data, Synchro Data, CAL3QHC Data (pdf 0.3 Mb)
  • D4.4 - Consistency with Land use Plans, Goals, and Policies (pdf 0.1 Mb)
  • D4.10 - Hazardous Material Sites with Potential to Affect the Project (pdf 145 Mb)
  • D4.14 - Historic Properties in the Area of Potential Effect Listed or Determined Eligible for the National Register of Historic Places (pdf 0.2 Mb)
  • D4.15 - Social Resources and Environmental Justice Impacts and Mitigation Summary
  • E - Permits and Approvals (pdf 0.1 Mb)
  • F - Section 4(f) (pdf 5.9 Mb)
  • G - Preliminary Design Drawings of Locally Preferred Alternative (pdf 13.2 Mb)
  • H1 - Transportation Technical Report (pdf 76.6 Mb)
  • H3 - Noise and Vibration Technical Report (pdf 23.5 Mb)
  • H7 - Visual and Aesthetic Resources Technical Report (pdf 12.5 Mb)
  • H14 - Cultural, Historic, and Archaeological Resources Technical Report (pdf 17.1 Mb)
  • I - Endangered Species Act Screening Checklist(pdf 0.9 Mb)

Legal Notices:

  • NEPA - Notification of Availability (NOA)
  • SEPA - DNS/Adoption of Existing Environmental Document

Project Materials

Small Starts Application

Urban Design Analysis

Transitway and Station Concepts

September 29 and 30, 2015, Open House materials

November 19, 2014, Open House materials

Locally Preferred Alternative approval by Council

FTA approval of City of Seattle request for entry into project development

Seattle Center City Connector Transit Study



 


  HOME | ABOUT | SLU | FIRST HILL | BROADWAY | CENTER CITY | SPONSOR | CONTACT
go to first hill main page go to South Lake Union main page go to Broadway Extention main page go to Center City Connector main page