First Hill StreetCar Construction

Project Updates

April 15 -21

BROADWAY- 14th/YESLER- JACKSON - CONSTRUCTION DETAIL
New Signal Changes

  • New Signal changes
    • New signal at Broadway and Terrace is now on
    • Temporary flash mode for 7- 10 days
    • Yellow = proceed with caution
    • Red = come to a complete stop

Weekday Work: 7 a.m.- 5 p.m.

  • Project wide activities
    • Electrical testing
    • Traffic sign installations
    • Landscaping
    • Permanent lane striping and pavement markings
    • Electrical substation work
    • Platform shelter, benches, and handrail installations
  • Broadway
    • Cherry - Pole installation
  • Yesler
    • Boren to Broadway - Utility work
  • Jackson
    • Sidewalk restoration: 14th, 6th and Occidental

Weekend Work: Saturday 6 a.m.- 10 p.m.

  • Broadway from James to Boren
    • Overhead electrical work
  • Jackson at Occidental and from

4th - 5th

  • Overhead electrical work

Night Work: Tues- Fri 7 p.m.- 5 a.m.

  • Permanent striping on Broadway and Jackson (weather dependent)

What to Expect During Construction:

  • Lane restrictions
  • On- street parking and loading restrictions
  • Traffic and pedestrian detours
  • Construction noise and dust


Past Project Updates

April 8 - April 13

BROADWAY - CONSTRUCTION DETAIL
New Signal Changes

  • New Signal changes
    • Signals will be turned on at Broadway &Marion
    • Temporary flash mode for 7 - 10 days
    • Yellow = proceed with caution
    • Red = come to a complete stop

Weekday Work: 7 a.m. - 5 p.m.

  • Project wide activities
    • Traffic sign installations
    • Electrical testing
    • Permanent lane striping and pavement markings
    • Landscaping
    • Platform shelter installations
  • Pine to Madison
    • Sidewalk restoration
  • Union and Harvard
    • Survey monument installations
  • James to Boren
    • Substation electrical work

Saturday Work: 7 a.m. - 8 p.m.

  • James to Boren
    • Substation electrical work

What to Expect During Construction:

  • On street parking and loading restrictions
  • Increased truck traffic
  • Pedestrian detours
  • Construction noise and dust

14TH/YESLER SEGMENT - CONSTRUCTION DETAIL
New Signal Changes

  • New Signal changes
    • Signals will be turned on at Broadway &Terrace
    • Temporary flash mode for 7 - 10 days
    • Yellow = proceed with caution
    • Red = come to a complete stop

Weekday Work:
7 a.m. - 5 p.m.

  • Project wide activities
    • Traffic sign installations
    • Electrical testing
    • Landscaping
    • Permanent lane striping and pavement markings
    • Platform shelter installations
  • Main Street
    • Survey monument installation
    • Substation electrical work
  • Boren and Yesler
    • Roadway sensor installation
  • Jackson at 14th
    • Sidewalk restoration work

Weekend work:
Sat. 7 a.m. - 5 p.m.

  • Terrace
    • Platform shelter installation
  • James to Boren
    • Overhead electrical work
  • Yesler and 13th Platforms (2 p.m. - 8 p.m.)
    • Shelter installation

Sun. 7 a.m. - 7 p.m.

  • 14th and 8th
    • Overhead electrical work

What to Expect During Construction:

  • Pedestrian detours
  • Lane closures
  • On street parking and loading restrictions
  • Driveway restrictions
  • Construction noise and dust

JACKSON SEGMENT - CONSTRUCTION DETAIL
Platform Installations
CONSTRUCTION DETAIL
Weekday Work: 7 a.m. - 5 p.m.

  • Project wide activities
    • Electrical testing
    • Traffic sign installations
    • Landscaping
    • Permanent lane striping and pavement markings
    • Platform shelter installations
  • 6th to 7th
    • Sidewalk restoration
    • Overhead electrical work

Weekend Work: 6 a.m. - 8 p.m.

4th - 5th

  • Roadway restoration

5th - 8th

  • Electrical work
  • Platform installation
  • Occidental
    • Platform installation

What to Expect During Construction:

  • Lane restrictions
  • On - street parking and loading restrictions
  • Traffic and pedestrian detours
  • Construction noise and dust

BROADWAY - CONSTRUCTION DETAIL
Lane Striping and Electrical Testing
Weekday Work: 7 a.m. - 5 p.m.

  • Project wide activities
    • Traffic sign installations
    • Electrical testing
    • Permanent lane striping and pavement markings
    • Landscaping
    • Platform shelter installations
  • Howell
    • Overhead electrical work
  • Union to Madison
    • Sidewalk restoration
    • Survey monument installations
  • Madison - Boylston to Summit
    • Sidewalk restoration
  • Marion Plaza
    • Lighting installations

What to Expect During Construction:

  • On street parking and loading restrictions
  • Increased truck traffic
  • Pedestrian detours
  • Construction noise and dust

14TH/YESLER SEGMENT - CONSTRUCTION DETAIL
April 2 - Intersection Closure at 10th and Jackson
Weekday Work: 7 a.m. - 5 p.m.

  • Project wide activities
    • Traffic sign installations
    • Electrical testing
    • Landscaping
    • Permanent lane striping and pavement markings
    • Platform shelter installations
  • Terrace platform
    • Lighting installation
  • 14th - Yesler to Main
    • Roadway restoration
    • Utility pole installation
  • Main Street
    • Substation electrical work
    • Install bollards
  • Jackson at 14th
    • Sidewalk restoration work
  • 10th at Jackson
    • Roadway restoration work on south side of intersection

Weekend work: Sat. 6 a.m. - 12 p.m.

  • Jackson - 10th to 12th
    • Overhead electrical installations

Traffic Advisory: (Date may change due to weather)
April 2: The south side of the 10th and Jackson intersection will be closed for paving. East- and westbound traffic on Jackson will be permitted.

What to Expect During Construction:

  • Traffic and pedestrian detours
  • Lane closures
  • On street parking and loading restrictions
  • Driveway restrictions
  • Construction noise and dust

JACKSON SEGMENT - CONSTRUCTION DETAIL
Street Closures on 6th, Maynard, and 7th at Jackson
CONSTRUCTION DETAIL
Weekday Work: 7 a.m. - 5 p.m.

  • Project wide activities
    • Electrical testing
    • Traffic sign installations
    • Landscaping
    • Permanent lane striping and pavement markings
    • Platform shelter installations
  • 5th to 7th
    • Concrete work on platform at 5th
    • Asphalt roadway restoration at 6th, Maynard, & 7th
    • Sidewalk brick restoration
    • Overhead electrical work

Weekend Work: 6 a.m. - 8 p.m.

    • Overhead electrical work on Jackson at 2nd Ave and at 2nd Ave Extension

Traffic Advisories: (Dates may change due to weather)
April 1- 2: There will be partial closures at the following intersections on Jackson.
6th Ave - North and south sides closed 4/1 - 4/2
Maynard Ave - North and south sides closed 4/2
7th Ave- South side closed 4/2
April 5: Partial closure of intersection of 2nd Ave at Jackson. East- and westbound traffic on Jackson will be permitted.

What to Expect During Construction:

  • Lane restrictions
  • On- street parking and loading restrictions
  • Traffic and pedestrian detours
  • Construction noise and dust

 

March 25 - 30

BROADWAY - CONSTRUCTION DETAIL
Installing Shelters & Handrails on Platforms
Weekday Work: 7 a.m. - 5 p.m.

  • Project wide activities
    • Platform shelter and handrail installations
    • Landscape installations
    • Permanent lane striping and pavement markings
  • Howell
    • Overhead electrical work
  • Union
    • Sidewalk restoration
  • Madison - Broadway to Summit
    • Sidewalk restorations
  • Madison to Marion
    • Platform lighting installation
    • Sidewalk restorations

Weekend work: 6 a.m. - 8 p.m.

  • Platform shelter and handrail installations
  • Overhead electrical installation from Union to Pine
  • Traction Power Substation (TPSS) installation at Minor

Traffic Advisory
March 29: Minor will be closed between James and Broadway for TPSS installation 7 a.m. - 3 p.m. Also, southbound Broadway will be closed between James and Jefferson 7-9 a.m.
What to Expect During Construction:

  • On street parking and loading restrictions
  • Increased truck traffic
  • Traffic and pedestrian detours
  • Construction noise and dust

14TH/YESLER SEGMENT - CONSTRUCTION DETAIL
Saturday - Partial Intersection Closure at 12th and Jackson
Weekday Work: 7 a.m. - 5 p.m.

  • Project wide activities
    • Platform shelter and handrail Installations
    • Permanent lane striping and pavement markings
    • Tree stump removals and landscape installations
  • Terrace Platform
    • Lighting installations
  • Yesler at 12th
    • Signal and sign installations
  • Main at 14th
    • Bollard installation at electrical substation
  • Jackson - 12th to Rainier
    • Sidewalk restorations
    • Utility pole removal
  • Jackson at 10th
    • Sidewalk restorations
    • Utility pole removal

Weekend work:
Sat. 9 a.m. - 7 p.m. (Date may change due to weather)

  • Jackson and 12th intersection
    • Asphalt paving restoration

Traffic Advisories: (Dates may change due to weather)
Mar 29: The north and south sides of the 12th and Jackson intersection will be closed for asphalt paving. East- and westbound traffic on Jackson will be permitted.
April 3: The north and south sides of the 10th and Jackson intersection will be closed for paving. East- and westbound traffic on Jackson will be permitted.
What to Expect During Construction:

  • Traffic and pedestrian detours
  • Lane closures
  • On street parking and loading restrictions
  • Driveway restrictions
  • Construction noise and dust

JACKSON SEGMENT - CONSTRUCTION DETAIL
Saturday - Partial Intersection Closure at Jackson & 5th
CONSTRUCTION DETAIL
Weekday Work: 7 a.m. - 5 p.m.

  • Project wide activities
    • Platform shelter and handrail installations
    • Street sign installations
    • Landscape installations
    • Permanent lane striping and pavement markings
  • 5th to 8th
    • Sidewalk restoration

Saturday: 5 a.m. - 5 p.m.

  • 5th and Jackson
    • Asphalt paving

Saturday and Sunday: 6 a.m. - 8 p.m.

  • 1st to 3rd
    • Overhead electrical installations

Traffic Advisories: (Dates may change due to weather)
Mar. 29: The north and south sides of the 5th and Jackson intersection will be closed for asphalt paving. East- and westbound traffic on Jackson will be permitted.
April 1 - 3: There will be partial closures at the following intersections on Jackson. 6th - North and south sides closed 4/1 - 4/3
Maynard - North and south sides closed 4/3
7th - South side closed 4/3

What to Expect During Construction:

  • Lane restrictions
  • On-street parking and loading restrictions
  • Traffic and pedestrian detours
  • Construction noise and dust
  • Odors from asphalt paving

 

March 18 - 23

BROADWAY - CONSTRUCTION DETAIL
Weekend Intersection Closure at Broadway and Madison
Weekday Work: 7 a.m. - 5 p.m.

  • Project wide activities
    • Platform shelter and handrail Installations
    • Landscape installations
    • Overhead electrical installations
  • Pike to Madison
    • Concrete saw cutting on Madison between Boylston and Summit
  • Cherry to Jefferson
    • Sidewalk restoration and pedestrian ramp installations

Weekend work: 6 a.m. - 10 p.m.

  • Overhead electrical installation at Madison
  • Install electrical substation at Minor

Traffic Advisories
Mar. 22: 6 a.m. - 4 p.m. Minor will be closed between James and Jefferson for an electrical substation delivery and installation

Mar. 22 - 23: 6 a.m. - 10 p.m. Full intersection closure of Broadway and Madison for overhead electrical work

What to Expect During Construction:

  • On street parking and loading restrictions
  • Increased truck traffic
  • Traffic and pedestrian detours
  • Construction noise and dust

14TH/YESLER SEGMENT - CONSTRUCTION DETAIL
Sidewalk Restorations
Weekday Work: 7 a.m. - 5 p.m.

  • Project wide activities
    • Platform shelter and handrail Installations
    • Landscape installations
    • Overhead electrical installations
  • Main and 14th
    • Replace bollards at substation
  • Jackson - 12th to Rainier
    • Sidewalk restorations
    • Utility pole removal
  • Jackson at 10th
    • Sidewalk restorations
    • Utility pole removal

What to Expect During Construction:

  • Traffic and pedestrian detours
  • Lane closures
  • On street parking and loading restrictions
  • Driveway restrictions
  • Construction noise and dust

JACKSON SEGMENT - CONSTRUCTION DETAIL
Saturday Closure of Jackson between 3rd and 4th
Weekday Work: 7 a.m. - 5 p.m.

  • Project wide activities
    • Platform shelter and handrail Installations
    • Landscape installation
    • Overhead electrical installations
  • 1st to 2nd Ave Extension
    • Sidewalk restoration
  • 5th to 8th
    • Platform construction at 5th
    • Sidewalk and pedestrian ramp restoration at 6th and at 8th
    • Utility pole removal
  • 8th Ave at Lane
    • Sidewalk and pedestrian ramp restoration

Saturday Work: 6 a.m. - 7 p.m.

  • Occidental to 2nd Ave Extension
    • Asphalt paving

Traffic Advisory:
Mar. 22 - 6 a.m. to 7 p.m.: Jackson between 3rd Ave and 4th Ave will be closed to traffic
What to Expect During Construction:

  • Lane restrictions
  • On- street parking and loading restrictions
  • Traffic and pedestrian detours
  • Construction noise and dust
  • Odors from asphalt paving

 

March 11 - 16

BROADWAY - CONSTRUCTION DETAIL
Weekend Intersection Closures at Jefferson and James
Weekday Work: 7 a.m. - 5 p.m.

  • Project wide activities
    • Platform shelter and handrail Installations
    • Topsoil installation and irrigation testing
    • Drainage hole cutting in rails
  • Howell
    • Overhead electrical wiring at Howell
  • Madison to Columbia
    • Sidewalk restoration on Madison between Boylston and Broadway
  • Minor intersection
    • Overhead electrical wiring

Weekend work: 7 a.m. - 7 p.m.

  • Electrical substation installation on Howell
  • Asphalt paving at Union
  • Asphalt paving James to Boren

Traffic Advisories
Mar. 15:

  • Howell will be closed between Broadway and Nagle to install electrical substation
  • The east leg of the intersection of Jefferson and Broadway will be closed for paving
  • The east and west legs of the intersection of James and Broadway will be closed for paving.

What to Expect During Construction:

  • On street parking and loading restrictions
  • Increased truck traffic
  • Traffic and pedestrian detours
  • Construction noise and dust
  • Odors from asphalt paving

14TH /YESLER SEGMENT - CONSTRUCTION DETAIL
Sidewalk Restorations
Weekday Work: 7 a.m. - 5 p.m.

  • Project wide activities
    • Platform shelter and handrail Installations
    • Topsoil installation and irrigation testing
    • Drainage hole cutting in rails
  • 14th and Main
    • Overhead electrical installations
    • Asphalt roadway restoration
  • Jackson - 12th to Rainier
    • Sidewalk restorations
    • Utility pole removal
  • Jackson - 9th to 12th
    • Sidewalk restorations
    • Driveway restoration
    • Utility pole removal

What to Expect During Construction:

  • Traffic and pedestrian detours
  • Lane closures
  • On street parking and loading restrictions
  • Driveway restrictions
  • Construction noise and dust
  • Odors from asphalt paving

JACKSON SEGMENT - CONSTRUCTION DETAIL
Roadway and Sidewalk Restoration on 8th
Weekday Work: 7 a.m. - 5 p.m.

  • Project wide activities
    • Platform shelter and handrail Installations
    • Topsoil installation and irrigation testing
    • Drainage hole cutting in rails
  • 5th to 8th
    • Platform construction at 5th
    • Track repair
    • Sidewalk and curb ramp restoration
    • Utility pole removal
  • 1st to 2nd Ave Extension
    • Overhead electrical installations
  • 8th Ave - Jackson to Dearborn
    • Sidewalk and curb bulb restoration
    • Roadway restoration
    • Saw cutting at Dearborn

Weekend Work: 6 a.m. - 7 p.m.

  • 1st to 3rd
    • Overhead electrical installations
  • Dearborn and 8th intersection
    • Asphalt milling and concrete excavation
    • Roadway restoration

Traffic Advisory:
Mar. 15 - 6 a.m. to 7 p.m.:
Dearborn reduced to one lane in each direction at 8th Avenue

What to Expect During Construction:

  • Lane restriction
  • On- street parking and loading restrictions
  • Pedestrian detours
  • Construction noise and dust
  • Odors from asphalt paving

 

March 4 - 9

BROADWAY - CONSTRUCTION DETAIL
Sidewalk Restoration on Madison
Weekday Work: 7 a.m.- 5 p.m.

  • Denny Platform
    • Preparing platform for shelters
  • Union Platform
    • Preparing platform for shelters
  • Madison- Boylston to Broadway
    • Sidewalk restoration (weather dependent)
  • Marion Platforms
    • Preparing platform for shelters

Sunday work (weather dependent):
7 a.m.- 7 p.m.

  • Jefferson Intersection
    • Asphalt roadway restoration

Traffic Advisories
Mar 9:The east leg of the intersection of Jefferson and Broadway will closed for paving.

Mar. 15 & 16: The west leg of the intersection of James and Broadway will be closed for paving.

What to Expect During Construction:

  • On street parking and loading restrictions
  • Increased truck traffic
  • Traffic and pedestrian detours
  • Construction noise and dust
  • Odors from asphalt paving

14TH/YESLER SEGMENT - CONSTRUCTION DETAIL
Sidewalk and Roadway Restorations
Weekday Work: 7 a.m.- 5 p.m.

  • 14th- Jackson to Washington
    • Asphalt roadway restoration
  • Main- West of 14th
    • Asphalt roadway restoration
    • Work at electrical substation
  • Jackson- 12th to 14th
    • Sidewalk restoration
  • Jackson- 9th to 10th
    • Overhead electrical installation
    • Utility pole removal

Traffic Advisory:
Mar. 3- 5: 14th closed between Jackson and Washington

What to Expect During Construction:

  • Traffic and pedestrian detours
  • Lane closures
  • On street parking and loading restrictions
  • Driveway restrictions
  • Construction noise and dust
  • Odors from asphalt paving

JACKSON SEGMENT - CONSTRUCTION DETAIL
Platform Work between 5th and 6th
Weekday Work: 7 a.m.- 5 p.m.

  • 5th to 8th
    • Platform construction
    • Sidewalk and pedestrian curb ramp restoration
    • Utility pole removal
  • 8th - Jackson to Dearborn
    • Sidewalk restoration and pedestrian ramp installations at Lane
    • Roadway restoration

No work scheduled Thursday and Friday

Traffic Advisory:
Mar. 15 & 16: Dearborn reduced to one lane in each direction at 8th Avenue

What to Expect During Construction:

  • Lane restriction
  • On- street parking and loading restrictions
  • Pedestrian detours
  • Construction noise and dust

 

February 25 - March 2

BROADWAY - CONSTRUCTION DETAIL
Sidewalk Restoration on Madison
Weekday Work: 7 a.m.- 5 p.m.

  • Madison- Boylston to Broadway
    • Sidewalk restoration
    • Utility pole installation
  • Marion Plaza
    • Sidewalk restoration
    • Asphalt paving at Marion
  • Cherry to Jefferson
    • Utility pole support wire installations
    • Electrical installations at power substation
    • Asphalt paving

What to Expect During Construction:

  • On street parking and loading restrictions
  • Increased truck traffic
  • Pedestrian detours
  • Construction noise and dust

14TH/YESLER SEGMENT - CONSTRUCTION DETAIL
Sidewalk and Roadway Restorations
Weekday Work: 7 a.m.- 5 p.m.

  • Broadway - Boren to Yesler
    • Sidewalk restoration
    • Asphalt paving in northbound curb lane
    • Curb installation in bike lane
  • Yesler - Broadway to 14th
    • Utility pole support wire installations
    • Track repair
  • 14th- Washington to Jackson
    • Asphalt roadway restoration
  • Main
    • Install power substation
  • Jackson- 12th to 14th
    • Street light installation
    • Sidewalk restoration
    • Concrete saw cutting
  • Jackson- 9th to 10th
    • Sidewalk restoration
    • Utility pole removals
    • Concrete saw cutting

Traffic Advisory:
Feb. 27: Main closed to through traffic between 14th and Boren
Mar. 3- 4: 14th closed between Jackson and Washington

What to Expect During Construction:

  • Traffic and pedestrian detours
  • Lane closures
  • On street parking and loading restrictions
  • Driveway restrictions
  • Construction noise and dust

JACKSON SEGMENT - CONSTRUCTION DETAIL
Partial Intersection Closures at 8th and Jackson (Wed, Thurs, Sat) and at 5th and Jackson (Sun)
CONSTRUCTION DETAIL
Jackson Weekday Work:
Weekday Work: 7 a.m.- 5 p.m.

  • 5th to 8th
    • Electrical work at 5th
    • Sidewalk restoration - Maynard to 7th
    • Utility pole removals
  • 8th - Jackson to Dearborn
    • Sidewalk restoration and pedestrian ramp installations
    • Concrete saw cutting
    • Roadway restoration

Weekend Work: 7 a.m. to 10 p.m.

  • Jackson- 3rd to 8th
    • Excavation for station platform at 5th
    • Overhead electrical work
  • 8th and Jackson intersection - Saturday
    • Overhead electrical installation
  • 5th and Jackson intersection - Sunday
    • Overhead electrical installation

Traffic Advisories:
Feb 26- 27, Mar. 1: 8th closed at Jackson
Mar 2: Partial closure of 5th and Jackson intersection. East- and westbound traffic on Jackson and right turns at the intersection will be permitted. Through traffic on 5th across Jackson and left turns will not be permitted.

What to Expect During Construction:

  • Lane restriction
  • On- street parking and loading restrictions
  • Pedestrian detours
  • Construction noise and dust

 

February 18 - 23

BROADWAY - CONSTRUCTION DETAIL
Weekend Closures at James, Jefferson & Boren
Weekday Work: 7 a.m. - 5 p.m.

  • Union intersection
    • Curb restoration
  • Madison -Boylston to Broadway
    • Sidewalk restoration
  • Marion to James
    • Sidewalk restoration at Marion Plaza
    • Electrical installations

Saturday Work:

  • Union intersection - 7 a.m. start time
    • Roadway restoration
  • Boren intersection - 5 a.m. - 12 p.m. Asphalt roadway restoration
  • Jefferson intersection - 12 p.m. - 6 p.m.
    • Asphalt roadway restoration
  • James intersection - 6 a.m. - 10 p.m.
    • Asphalt roadway restoration
  • James to Boren northbound curb lane
    • Asphalt paving

NOTE: Above asphalt work may be moved to Saturday due to weather

Traffic Advisory:
Feb 22: Three intersections on Broadway will be partially closed for asphalt paving beginning at 5 a.m. on Saturday: James (east and west legs), Jefferson (east leg) and Boren (east leg). Only two of three intersections will be closed at any time.

What to Expect During Construction:

  • On street parking and loading restrictions
  • Increased truck traffic
  • Traffic and pedestrian detours
  • Construction noise and dust

14TH /YESLER SEGMENT - CONSTRUCTION DETAIL
Saturday - Partial Closure of 12th and Jackson Intersection
Weekday Work: 7 a.m. - 5 p.m.

  • Broadway - Spruce to Fir
    • Sidewalk restoration
    • Curb installation in bike lane
  • Yesler - Boren to 14th
    • Electrical installations
    • Track repair
  • 14th - Washington to Jackson
    • Track construction
    • Platform construction
    • Overhead electrical installations
  • Jackson - 10th to 12th
    • Sidewalk restoration

Weekend Work: 6 a.m. - 7 p.m.

  • Saturday - Jackson and 12th - intersection
    • Overhead electrical installations
  • Sunday - Jackson at 10th
    • Overhead electrical installations

Traffic Advisory:
Feb 22: Partial closure of 12th Ave and Jackson intersection. East- and westbound traffic on Jackson and right turns at the intersection will be permitted. Through traffic on 12th across Jackson and left turns will not be permitted.

What to Expect During Construction:

  • Traffic and pedestrian detours
  • Lane closures
  • On street parking and loading restrictions
  • Driveway restrictions
  • Construction noise and dust

JACKSON SEGMENT - CONSTRUCTION DETAIL
Roadway and Sidewalk Restoration at Southeast Corner of 8th and Jackson
CONSTRUCTION DETAIL
Jackson Weekday Work:
Weekday Work: 7 a.m. - 5 p.m.

  • 2nd to 8th
    • Sewer inspection at 2nd
    • Electrical work at 5th
    • Overhead and ground level electrical installations between 6th and 8th
    • Sidewalk restoration - Maynard to 7th
    • Roadway and sidewalk restoration at 8th
  • 8th - Weller to Dearborn
    • Sidewalk restoration
    • Landscape strip construction

Weekend Work: Sat 7 a.m. to Sun 10 p.m.

  • 2nd to 3rd
    • Sewer repair (overnight work)
  • 1st to 8th
    • Overhead electrical work

Traffic Advisories:
Feb 18 - 21: No northbound turns to Jackson from 8th
Feb 24 - 28: There will be intermittent closures of 8th at Jackson
Mar 1: 8th closed at Jackson
Mar 2: Partial closure of 5th and Jackson intersection. East- and westbound traffic on Jackson and right turns at the intersection will be permitted. Through traffic on 5th across Jackson and left turns will not be permitted.

What to Expect During Construction:

  • Lane restriction
  • On-street parking and loading restrictions
  • Pedestrian detours
  • Construction noise and dust

 

February 11 - 16

BROADWAY -CONSTRUCTION DETAIL
Weekend Closure at Jefferson Intersection
Weekday Work: 7 a.m. -5 p.m.

  • Pine to Boren
    • Overhead electrical adjustments
  • Madison - Boylston to Broadway
    • Sidewalk restoration
  • Marion to Columbia
    • Roadway and sidewalk restoration
  • James to Jefferson
    • Electrical installations

Weekend Work:

  • Pine intersection - Sun 7 - 1 1 a.m.
    • Overhead electrical work
  • Pike to Union -Saturday
    • Utility pole installation
  • James and Boren intersections -Sat. 7 a.m. to 10 p.m.
    • Roadway restoration
  • Jefferson intersection -Sat. 6 a.m. to 10 p.m., Sun. 7 a.m. to 10 p.m.
    • Overhead electrical work

Traffic Advisory:
Feb 15 - 16:The intersection of Broadway and Jefferson will be closed to traffic for overhead electrical work.
Feb 15: The east legs of the James and Broadway and the Boren and Broadway intersections will be closed for asphalt paving. These closures will not occur at the same time.

What to Expect During Construction:

  • On street parking and loading restrictions
  • Increased truck traffic
  • Traffic and pedestrian detours
  • Construction noise and dust

14TH /YESLER SEGMENT -CONSTRUCTION DETAIL
Track Construction Continues on 14th between Washington and Jackson

The Final Stretch of Track

Weekday Work: 7 a.m. -5 p.m.

  • Broadway -Boren to Yesler
    • Form and pour cycle track curb
    • Roadway restoration
  • Yesler -Boren to 14th
    • Overhead electrical installations
    • Concrete saw cutting
    • Roadway restoration
  • 14th -Washington to Jackson
    • Track construction
    • Platform construction
    • Concrete saw cutting
    • Overhead electrical installations
  • Jackson -10th to 12th
    • Sidewalk restoration on north side
    • Roadway restoration
    • Utility pole foundation removals

Saturday Work: 7 a.m. -5 p.m.

  • Broadway at Boren
    • Roadway restoration

Traffic Advisory:
Feb 22: Partial closure of 12th Ave and Jackson intersection. East - and westbound traffic on Jackson and right turns at the intersection will be permitted. Through traffic on 12th across Jackson and left turns will not be permitted.

What to Expect During Construction:

  • Pedestrian detours
  • Lane closures
  • On street parking and loading restrictions
  • Driveway restrictions
  • Construction noise and dust

JACKSON SEGMENT -CONSTRUCTION DETAIL
Roadway and Sidewalk Reconstruction at Southwest Corner of 8th and Jackson
CONSTRUCTION DETAIL
Jackson Weekday Work:
7 a.m. -5 p.m.

  • 3rd to 8th
    • Sidewalk restoration -3rd to 2nd Ave Ext
    • Concrete saw cutting and electrical work at 5th
    • Overhead and ground level electrical installations between 6th and 8th
    • Sidewalk restoration between Maynard and 7th
    • Roadway and sidewalk restoration at 8th

Traffic Advisories:
Feb 10 -14: No southbound turns to 8th from Jackson
Feb 18 -21: No northbound turns to Jackson from 8th
Feb 24 -28: There will be intermittent closures of 8th at Jackson
Mar 1: 8th closed at Jackson
Mar 2: Partial closure of 5th and Jackson intersection. East - and westbound traffic on Jackson and right turns at the intersection will be permitted. Through traffic on 5th across Jackson and left turns will not be permitted.

What to Expect During Construction:

  • Lane restriction
  • On - street parking and loading restrictions
  • Pedestrian detours
  • Construction noise and dust

 

February 4 - 9

BROADWAY - CONSTRUCTION DETAIL
Weekend Closures on Broadway at the Jefferson & James Intersections
Weekday Work: 7 a.m. - 5 p.m.

  • Howell intersection
    • Overhead electrical installations
  • Madison –Boylston to Broadway
    • Saw cutting for sidewalk restoration
  • Marion to James
    • Sidewalk restoration
    • Roadway restoration
  • Minor intersection
    • Electrical installations

Weekend Work:
6 a.m. - 10 p.m.

  • James and Cherry intersections
    • Roadway restoration
  • Jefferson intersection
    • Overhead electrical work
    • Roadway restoration

Traffic Advisory:

Feb 8 - 9 & 15 - 16:The intersection of Broadway and Jefferson will be closed to traffic for overhead electrical work.
Feb 8 or 9: The east leg of James & Broadway will be closed for asphalt restoration. This paving work is weather dependent.

What to Expect During Construction:

  • On street parking and loading restrictions
  • Increased truck traffic
  • Traffic and pedestrian detours
  • Construction noise and dust

14TH /YESLER SEGMENT -CONSTRUCTION DETAIL
Track Construction Continues on 14th between Washington and Jackson

  • The Final Stretch of Track -

Weekday Work: 7 a.m. - 5 p.m.

  • Broadway at Terrace
    • Platform construction
  • Broadway -Boren to Yesler
    • Roadway restoration
    • Form and pour cycle track curb
  • Yesler -Broadway to 12th
    • Roadway restoration
    • Electrical installations
  • 14th – Washington to Jackson
    • Track construction
    • Signal installations
  • Jackson – 12th to Rainier
    • Signal installations
    • Concrete saw cutting

Traffic Advisory:

Feb 22: Partial closure of 12th Ave and Jackson intersection. East - and westbound traffic on Jackson and right turns at the intersection will be permitted. Through traffic on 12th across Jackson and left turns will not be permitted.

What to Expect During Construction:

  • Traffic and pedestrian detours
  • Lane closures
  • On street parking and loading restrictions
  • Driveway restrictions

JACKSON SEGMENT -CONSTRUCTION DETAIL
Seahawks Parade Coordination & Sidewalk Reconstruction
CONSTRUCTION DETAIL

Jackson Weekday Work:
7 a.m. – 5 p.m.

  • 3rd to 8th
    • Electrical installations at 2nd Ave Ext
    • Sidewalk renovation on south side 3rd to 2nd Ave Ext
    • Electrical work at 5th
    • Concrete saw cutting on south side between Maynard and 8th

Traffic Advisories:

Feb 10 – 14: No southbound turns to 8th from Jackson
Feb 18 – 21: No northbound turns to Jackson from 8th
Feb 24 – 28: There will be intermittent closures of 8th at Jackson
Mar 1: 8th closed at Jackson
Mar 2: Partial closure of 5th and Jackson intersection. East - and westbound traffic on Jackson and right turns at the intersection will be permitted. Through traffic on 5th across Jackson and left turns will not be permitted.

What to Expect During Construction:

  • On - street parking and loading restrictions
  • Pedestrian detours
  • Construction noise and dust

 

January 28 - February 2

BROADWAY - CONSTRUCTION DETAIL
Full Weekend Closure of Broadway and Jefferson Intersection

Weekday Work: 7 a.m. - 5 p.m.

  • Howell to Madison
    • Sidewalk restorations
  • Madison to Columbia
    • Sidewalk restoration at Marion
    • Tree pit construction
  • Cherry to James
    • Concrete saw cutting
  • Jefferson to Boren
    • Sidewalk and pedestrian ramp restorations
    • Utility pole installations
    • Roadway restoration

Weekend Work:
Saturday 5 a.m. - Midnight
Sunday 7 a.m. - 10 p.m.

  • Jefferson intersection
    • Overhead electrical work

Traffic Advisory:

Feb 1 - 2, 8 - 9 & 15 - 16: The intersection of Broadway and Jefferson will be closed to traffic for overhead electrical work.
Feb 8 or 9: The east legs of Boren & Broadway and James & Broadway will be closed for asphalt restoration. These closures will not occur at the same time.

What to Expect During Construction:

  • On street parking and loading restrictions
  • Increased truck traffic
  • Traffic and pedestrian detours
  • Construction noise and dust

14TH /YESLER SEGMENT - CONSTRUCTION DETAIL
Track Construction Continues on 14th between Washington and Jackson

  • The Final Stretch of Track -

Weekday Work: 7 a.m. - 5 p.m.

  • Broadway - Terrace to Yesler
    • Sidewalk and pedestrian ramp restorations between Terrace and Boren
    • Form and pour cycle track curb from Boren to Yesler
    • Concrete saw cutting at Spruce
    • Roadway restoration
  • Yesler – Broadway to 12th
    • Concrete saw cutting
  • 14th – Washington to Jackson
    • Track construction
    • Roadway restoration between the track slabs

Traffic Advisory:
Feb 22: Partial closure of 12th Ave and Jackson intersection. East - and westbound traffic on Jackson and right turns at the intersection will be permitted. Through traffic on 12th across Jackson and left turns will not be permitted.

What to Expect During Construction:

  • Traffic and pedestrian detours
  • Lane closures
  • On street parking and loading restrictions
  • Driveway restrictions
  • Construction noise and dust

JACKSON SEGMENT - CONSTRUCTION DETAIL
Sidewalk Reconstruction

Jackson Weekday Work:
7 a.m. - 7 p.m.

  • Occidental to 8th
    • Traffic signal installation at Occidental
    • Sidewalk renovation on north side 3rd to 2nd Ave Ext
    • Electrical work at 5th
    • Street lighting electrical work on south side between Maynard and 7th

Traffic Advisories:

Feb 10 – 14: No southbound turns to 8th from Jackson
Feb 18 – 21: No northbound turns to Jackson from 8th
Feb 24 – 28: There will be intermittent lane closures at 8th and Jackson
Mar 1: No north - or southbound turns at 8th and Jackson
Mar 2: Partial closure of 5th and Jackson intersection. East - and westbound traffic on Jackson and right turns at the intersection will be permitted. Through traffic on 5th across Jackson and left turns will not be permitted.

What to Expect During Construction:

  • On - street parking and loading restrictions
  • Pedestrian detours
  • Construction noise and dust

January 21 - 26

BROADWAY - CONSTRUCTION DETAIL
Full Weekend Closure of Broadway and Union Intersection
Weekday Work: 7 a.m.- 5 p.m.

  • Howell intersection
    • Overhead electrical work
  • Union to Cherry
    • Lane striping and green cycle track markings
  • Madison to Columbia
    • Traffic signal installation at Marion
    • Irrigation and top soil installations in Marion plaza
  • Minor to Boren
    • Overhead electrical work
    • Sidewalk and pedestrian ramp restorations
    • Form and pour cycle track curb
    • Traffic signal installations

Weekend Work:
5 a.m. Saturday- 10 p.m. Sunday

  • Union intersection
    • Overhead electrical work

Traffic Advisory:
Jan 25-26: The intersection of Broadway and Union will be closed to traffic for overhead electrical work from Saturday at 5 a.m. until Sunday at 10 p.m.
Feb 1-2, 8-9 & 15-16:The intersection of Broadway and Jefferson will be closed to traffic for overhead electrical work.
Feb 8 or 9: The following closures will not occur at the same time. The east legs of Boren & Broadway and James & Broadway will be closed for asphalt restoration.

What to Expect During Construction:

  • On street parking and loading restrictions
  • Increased truck traffic
  • Pedestrian detours
  • Construction noise and dust

14TH/YESLER SEGMENT- CONSTRUCTION DETAIL
Track Construction Continues on 14th between Washington and Jackson

  • The Final Stretch of Track-

Weekday Work: 7 a.m.- 5 p.m.

  • Broadway- Jefferson to Boren
    • Sidewalk and pedestrian ramp restorations
    • Form and pour cycle track curb
    • Traffic signal installations
  • Broadway- Boren to Fir
    • Form and pour driveways on east side
  • 14th- Washington to Jackson
    • Track construction
    • Train signal conduit installation

Traffic Advisory:
Notice: 14th is now permanently closed to southbound traffic between Yesler and Jackson

What to Expect During Construction:

  • Traffic and pedestrian detours
  • Lane closures
  • On street parking and loading restrictions
  • Driveway restrictions
  • Construction noise and dust

JACKSON SEGMENT- CONSTRUCTION DETAIL

Congratulations SEAHAWKS!

Jackson Weekday Work:
7 a.m.- 7 p.m.

  • Occidental
    • Traffic signal installation
  • 3rd to 8th
    • Overhead electrical work
    • Sidewalk renovation at 7th
    • Street light electrical work
    • Utility pole removals

What to Expect During Construction:

  • On-street parking and loading restrictions
  • Pedestrian detours
  • Construction noise and dust

 

January 14 - 19

BROADWAY - CONSTRUCTION DETAIL
Ongoing Construction at Marion Plaza
Weekday Work: 7 a.m.-5 p.m

  • Pine to Madison
    • Sidewalk restoration
  • Madison to Columbia
    • Plaza construction and pedestrian ramp restoration at Marion
  • Jefferson to Boren
    • Sidewalk and pedestrian ramp restorations
    • Remove top layer of asphalt (northbound shoulder) between the east curb and the track slab from Jefferson and Yesler

Sunday Work: 10 a.m.-7 p.m.

  • Howell intersection
    • Overhead electrical installations

Traffic Advisory:
Jan 25-26: The intersection of Broadway and Union will be closed to traffic for overhead electrical work from Saturday at 5 a.m. until Sunday at midnight.
Feb 1-2, 8-9 & 15-16:The intersection of Broadway and Jefferson will be closed to traffic for overhead electrical work.
Feb 8-9: The east legs of Boren & Broadway and James & Broadway will be closed for asphalt restoration.

What to Expect During Construction:

  • On street parking and loading restrictions
  • Increased truck traffic
  • Pedestrian detours
  • Construction noise and dust

14TH /YESLER SEGMENT - CONSTRUCTION DETAIL
Track Construction Begins on 14th between Washington and Jackson
Weekday Work: 7 a.m.-5 p.m.

  • Jefferson to Boren
    • Sidewalk and pedestrian ramp restorations
  • Jefferson to Yesler
    • Remove top layer of asphalt (northbound shoulder)from the east curb to the track slab between Jefferson and Yesler
  • 14th -Washington to Jackson
    • Track construction
  • Jackson-8th to 14th
    • Track construction
    • Overhead electrical installations
    • Traffic signal installation
    • Utility pole removals
    • Excavate roadway for valve installations

Sunday Work: 7 a.m.-10 a.m.

  • Jackson-3rd to 14th
    • Overhead electrical installations

Traffic Advisory:
Notice: 14th is now permanently closed to southbound traffic between Yesler and Jackson

What to Expect During Construction:

  • Traffic and pedestrian detours
  • Lane closures
  • On street parking and loading restrictions
  • Driveway restrictions
  • Construction noise and dust

JACKSON SEGMENT - CONSTRUCTION DETAIL
GO SEAHAWKS!
CONSTRUCTION DETAIL

Jackson Weekday Work: 7 a.m.-7 p.m.

  • 3rd to 2nd Ave Extension
    • Sidewalk and pedestrian ramp renovations an north side
  • 5th to 8th
    • Signal installations
    • Excavate roadway for valve installations
    • Sidewalk renovation at 7th

Saturday Work: 7 a.m.-7 p.m.

  • Jackson - 3rd and 5th intersections
    • Overhead electrical installations

Sunday Work: 7 a.m.-10 a.m.

  • Jackson-3rd to 14th
    • Overhead electrical installations

What to Expect During Construction:

  • On-street parking and loading restrictions
  • Traffic detours and lane restrictions
  • Pedestrian detours
  • Construction noise and dust

Traffic Advisory:
Jan 18: There will be short term traffic interruptions at the intersection of Jackson and 5th for overhead electrical work.

 

January 7 - 12

BROADWAY - CONSTRUCTION DETAIL
Ongoing Construction at Marion Plaza
Weekday Work: 7 a.m. - 5 p.m.

  • Howell to Pine
    • Overhead electrical installations
    • Electrical substation work
  • Howell to Yesler
    • Electrical support wire installations
  • Madison to Columbia
    • Plaza construction at Marion
    • Landscape topsoil installation
  • James to Jefferson
    • Utility pole foundations removals
    • Electrical substation work

Traffic Advisory:
Jan 25-26: The intersection of Broadway and Union will be closed to traffic for overhead electrical work from Saturday at 5 a.m. until Sunday at midnight.
Feb 1-2, 8-9 & 15-16:The intersection of Broadway and Jefferson will be closed to traffic for overhead electrical work.

What to Expect During Construction:

  • On street parking and loading restrictions
  • Increased truck traffic
  • Pedestrian detours
  • Construction noise and dust

14TH/YESLER SEGMENT - CONSTRUCTION DETAIL
Track Construction Begins on 14th between Washington and Jackson
Weekday Work: 7 a.m. - 5 p.m.

  • Jefferson to Boren
    • Sidewalk and pedestrian ramp renovations
  • Broadway at Yesler
    • Storm detention pipe testing
  • 14th - Washington to Jackson
    • Excavation and grading for track construction
  • Main St. - Boren to 14th
    • Deliver and install traction power sub-station
  • Jackson - 8th to 12th
    • Track construction
    • Saw cutting for valve installations
    • Street lighting installations

Weekend Work: 6 a.m. - 7 p.m.

  • Jackson - 3rd to 14th
    • Overhead electrical installations

Traffic Advisory:
Jan 11: Southbound Boren will be reduced to one lane at Jackson for overhead electrical work.
Jan 12: There will be short term traffic interruptions in the intersections between 3rd and 14th for overhead electrical work.

Notice: 14th is now permanently closed to southbound traffic between Yesler and Jackson

What to Expect During Construction:

  • Traffic and pedestrian detours
  • Lane closures
  • On street parking and loading restrictions
  • Driveway restrictions
  • Construction noise and dust

JACKSON SEGMENT - CONSTRUCTION DETAIL
GO SEAHAWKS!
CONSTRUCTION DETAIL

Jackson Weekday Work: 7 a.m. - 7 p.m.

  • 3rd to 2nd Ave Extension
    • Saw cutting to prepare for sidewalk and pedestrian ramp renovations
  • 5th to 8th
    • Saw cutting for valve installation
    • Utility pole removal
  • 8th at Dearborn
    • Signal installations

Weekend Work: 6 a.m. - 7 p.m.

  • Jackson – 3rd to 14th
    • Overhead electrical installations

What to Expect During Construction:

  • On-street parking and loading restrictions
  • Traffic detours and lane restrictions
  • Pedestrian detours
  • Construction noise and dust

Traffic Advisory:
Jan 12: There will be short term traffic interruptions in the intersections between 3rd and 14th for overhead electrical work.

 

December 18 - 23

Holiday Notice
Streetcar construction activities will be suspended from Tuesday, December 24 through Thursday, January 3.

BROADWAY - CONSTRUCTION DETAIL
Ongoing Construction at Marion Plaza
Weekday Work: 7 a.m. -5 p.m.

  • Howell to Pine
    • Overhead electrical installations
    • Electrical support wire installations
    • Utility pole installation
  • Madison to Columbia
    • Plaza construction at Marion
    • Landscape topsoil installation
  • James to Jefferson
    • Form and pour curb for bike lane

Sunday Work:
6 a.m. -10 p.m.

  • Howell and Union intersections
    • Overhead electrical work

What to Expect During Construction:

  • On street parking and loading restrictions
  • Increased truck traffic
  • Pedestrian detours
  • Construction noise and dust

14TH/YESLER SEGMENT - CONSTRUCTION DETAIL
Track Construction Continues Between 8th and 10th
Weekday Work: 7 a.m. -5 p.m.

  • Jefferson to Boren
    • Platform construction for outbound platform at Terrace -east side of Broadway
    • Irrigation and landscape installations at Terrace platform -west side of Broadway
  • 14th -Washington to Rainier
    • Saw cutting for track construction
    • Milling to remove asphalt
    • Overhead electrical installations
  • Main - Boren to 14th
    • Deliver and install traction power sub-station
  • Jackson -8th to 10th
    • Concrete roadway panel replacements including 10th intersection
    • Track construction

Traffic Advisory:
Dec 15 - 18: No north- or southbound through traffic or left turns at 10th and Jackson intersection. Right turns only.
Jan 4 - 5: Southbound Boren will be reduced to one lane at Jackson
Jan 11: Partial intersection closure at 12th and Jackson. East- and westbound Jackson will be open. North- and southbound traffic on 12th will be required to make right turns at Jackson.

What to Expect During Construction:

  • Traffic and pedestrian detours
  • Lane closures
  • On street parking and loading restrictions
  • Driveway restrictions
  • Construction noise and dust

JACKSON SEGMENT - CONSTRUCTION DETAIL
Track Construction on Jackson Continues Between 3rd and 2nd Ave Extension
CONSTRUCTION DETAIL

Jackson Weekday Work: 7 a.m. -7 p.m.

  • 3rd to 2nd Ave Extension
    • Track construction
  • 5th to 10th
    • Platform construction at 7th
    • Track construction between 8th and 10th

Weekend Work: 6 a.m. -7 p.m.

  • 3rd and 2nd Ave Extension between Main and Jackson
    • Overhead electrical installations

What to Expect During Construction:

  • On-street parking and loading restrictions
  • Traffic detours and lane restrictions
  • Pedestrian detours
  • Construction noise and dust

Traffic Advisory:
Dec 21: 3rd Ave between Main and Jackson closed and lane restrictions on 2nd Ave Extension between Main and Jackson

 

December 10 - 15

BROADWAY - CONSTRUCTION DETAIL
Saturday Closure of Broadway and Pine Intersection
Weekday Work: 7 a.m. - 5 p.m.

  • Howell intersection
    • Utility pole removal and installation
  • Madison to Columbia
    • Plaza construction at Marion
    • Landscape topsoil installation
  • James to Jefferson
    • Excavate, grade and pave for bike lane from James to Jefferson

Saturday Work: 6 a.m. - 10 p.m.

  • Pine intersection
    • Overhead electrical work

Traffic Advisory:
Dec 14: The intersection of Pine and Broadway will be closed for overhead electrical modifications
What to Expect During Construction:

  • On street parking and loading restrictions
  • Increased truck traffic
  • Pedestrian detours
  • Construction noise and dust

14TH/YESLER SEGMENT - CONSTRUCTION DETAIL
Track Construction continues between 8th and 10th
Weekday Work: 7 a.m. - 5 p.m.

  • Jefferson to Boren
    • Grade, form and pour sidewalks at Terrace
    • Form and pour curb and gutter and asphalt paving on Boren between Broadway and Terrace
    • Saw cut and grade for outbound platform at Terrace – east side of Broadway
    • Platform construction for inbound platform at Terrace – west side of Broadway
  • 14th - Washington to Rainier
    • Saw cutting for track construction
  • Jackson - 12th to Rainier
    • Roadway reconstruction
    • Utility pole installation
  • Jackson - 8th to 10th
    • Track construction
    • Utility pole installation

Weekend Work: 6 a.m. - 7 p.m.

  • 14th – Yesler to Rainier
    • Overhead electrical installations
  • Jackson – 8th to 10th
    • Track construction
    • Roadway reconstruction

Traffic Advisory:
Dec 15 - 18: No north- or southbound through traffic or left turns at 10th and Jackson intersection. Right turns only
What to Expect During Construction:

  • Traffic and pedestrian detours
  • Lane closures
  • On street parking and loading restrictions
  • Driveway restrictions
  • Construction noise and dust

JACKSON SEGMENT - CONSTRUCTION DETAIL
Track Construction on Jackson Continues between 3rd and 2nd Ave Extension
CONSTRUCTION DETAIL

Jackson Weekday Work: 7 a.m. - 7 p.m.

  • 3rd to 2nd Ave Extension
    • Track construction
  • 5th to 10th
    • Platform construction at 7th
    • Track construction between 8th and 10th

8th Ave Weekday Work: 7 a.m. - 7 p.m.

  • Jackson to Dearborn
    • Overhead wire installation

Weekend Work: 6 a.m. - 7 p.m.

  • 3rd to 2nd Ave Extension
    • Excavation and track construction

What to Expect During Construction:

  • On-street parking and loading restrictions
  • Traffic detours and lane restrictions
  • Pedestrian detours
  • Construction noise and dust

Traffic Advisory:
Dec 21: 3rd Ave between Main and Jackson closed and lane restrictions on 2nd Ave Extension between Main and Jackson

 

December 3 - 8

BROADWAY - CONSTRUCTION DETAIL
Construction at the Marion/Boylston Plaza
Weekday Work: 7 a.m. - 5 p.m.

  • Howell to Pike
    • Utility pole foundation installation at Howell
    • Overhead electrical installations
  • Madison to Columbia
    • Grade, form and pour sidewalk on west side of Broadway between Marion and Boylston
    • Plaza construction at Marion
  • Columbia to James
    • Overhead electrical installations
    • Utility pole removals
  • James to Jefferson
    • Grade, form and pour sidewalks and curb ramps
    • Overhead electrical installations

Traffic Advisory:
Dec 14: The intersection of Pine and Broadway will be closed for overhead electrical modifications

What to Expect During Construction:

  • On street parking and loading restrictions
  • Increased truck traffic
  • Pedestrian detours
  • Construction noise and dust

14TH/YESLER SEGMENT - CONSTRUCTION DETAIL
Track Construction and Partial Intersection Closure at 10th
Weekday Work: 7 a.m. - 5 p.m.

  • Broadway - Jefferson to Boren
    • Plaza construction in Terrace/Boren triangle
    • Grade, form and pour sidewalks and curb ramps
    • Utility pole installations and removals
    • Overhead electrical installations
  • Yesler - Boren to 14th
    • Permanent signage installation
  • Jackson - 12th to Rainier
    • Permanent signage installation
    • Utility pole installation
  • Jackson and 10th intersection
    • Track construction
  • Jackson - 8th to 10th
    • Excavate and grade for track construction
    • Track construction

Saturday Work: 6 a.m. - 7 p.m.

  • Jackson - 8th to 10th
    • Excavate and grade for track construction

Traffic Advisory:
Dec 2 -16: No north- or southbound through traffic or left turns at 10th and Jackson intersection. Right turns only
Dec 8: Lane closures and intersection work on Jackson between 3rd and Rainier for overhead electrical installations
What to Expect During Construction:

  • Traffic and pedestrian detours
  • Lane closures
  • On street parking and loading restrictions
  • Driveway restrictions
  • Construction noise and dust

JACKSON SEGMENT - CONSTRUCTION DETAIL
Track Construction on Jackson Continues between 2nd Ave Extension and 5th
CONSTRUCTION DETAIL

Jackson Weekday Work: 7 a.m. - 7 p.m.

  • 3rd to 2nd Avenue Extension
    • Rail welding and track construction
    • Conduit installation
  • 5th to 10th
    • Signal installations at Maynard
    • Track construction between 8th and 10th

Weekend Work: 6 a.m. - 7 p.m.

  • 2nd Ave Extension to 8th
    • Overhead electrical installations
    • Excavate and grade for platform at 7th

What to Expect During Construction:

  • On-street parking and loading restrictions
  • Traffic detours and lane restrictions
  • Pedestrian detours
  • Construction noise and dust

Traffic Advisory:
Dec 7: Lane restrictions on Jackson between 2nd Ave Ext and 5th. 5 a.m. to 10 p.m.
Dec 8: Lane closures and intersection work on Jackson between 3rd and Rainier for overhead electrical installations
Dec 21: 3rd Ave between Main and Jackson closed and lane restrictions on 2nd Ave Extension between Main and Jackson

 

November 25 - December 1

BROADWAY - CONSTRUCTION DETAIL
Construction at the Marion/Boylston Plaza
Weekday Work: 7 a.m.-5 p.m.

  • Job-wide cleanup
  • Madison to Columbia
    • Grading for sidewalk restoration on west side of Broadway between Marion and Boylston
    • Plaza construction at Marion
    • Light pole foundation construction at Marion

Holiday Notice:
There will be a job-wide shutdown Nov 28-Dec 1

What to Expect During Construction:

  • On street parking and loading restrictions
  • Increased truck traffic
  • Pedestrian detours
  • Construction noise and dust

Note: Please do not park vehicles in the Broadway cycle track

14TH/YESLER SEGMENT - CONSTRUCTION DETAIL
Track Construction and Partial Intersection Closure at 10th
Weekday Work: 7 a.m.-5 p.m.

  • Job-wide cleanup
  • Broadway-Jefferson to Boren
    • Plaza construction in Terrace/Boren triangle
  • Jackson - 12th to Rainier
    • Concrete work at station platform
  • Jackson and 10th intersection
    • Track construction
  • Jackson-8th to 10th
    • Track construction

Holiday Notice:
There will be a job-wide shutdown Nov 28-Dec 1

Traffic Advisory:
Nov 23 -27 and Dec 2 -16: No north- or southbound through traffic or left turns at 10th and Jackson intersection. Right turns only
Dec 7: Lane closures and intersection work on Jackson between 3rd and Rainier for overhead electrical installations

What to Expect During Construction:

  • Traffic and pedestrian detours
  • Lane closures
  • On street parking and loading restrictions
  • Driveway restrictions
  • Construction noise and dust

JACKSON SEGMENT - CONSTRUCTION DETAIL
Track Construction on Jackson Continues between 2nd Ave Extension and 5th
CONSTRUCTION DETAIL

Jackson Weekday Work: 7 a.m.-7 p.m.

  • Job-wide cleanup
  • 2nd Avenue Extension to 5th
    • Rail welding and track construction
    • Conduit installation
  • 5th to 10th
    • Signal installations at 6th
    • Track construction between 8th and 10th

What to Expect During Construction:

  • On-street parking and loading restrictions
  • Traffic detours and lane restrictions
  • Pedestrian detours
  • Construction noise and dust

Traffic Advisory:
Dec 7: Lane closures and intersection work on Jackson between 3rd and Rainier for overhead electrical installations

Holiday Notice:
There will be a job-wide shutdown Nov 28-Dec 1

View Older Updates